Interception
well for P&A operations
with the goal of successful operations, respecting principles that guarantee: reducing operational risk, improving learning, sharing knowledge, increasing efficiency.
Respecting the environment and safely.
how we it
In order to optimize the stages of the process, Syngular Solutions uses the PDCA methodology to achieve excellence and obtain results in the face of challenges.
Plugging problem: damaged cased-well
A provisionally closed well, without access to the bottom, had a total collapse that prevented the column from descending to the bottom
An interception well was planned and drilled to allow access to the bottom of the original well and make the definitive plugging & abandonment possible.
Through the intercept well, the bottom cement plug was made and the top checked.
Then, a “U” shaped intermediate cement plug was performed in both wells.