top of page

Interception
well for P&A operations 
 

with the goal of successful operations, respecting principles that guarantee: reducing operational risk, improving learning, sharing knowledge, increasing efficiency. 
Respecting the environment and safely.

how we it

In order to optimize the stages of the process, Syngular Solutions uses the PDCA methodology to achieve excellence and obtain results in the face of challenges. 

Gráfico Ciclo PDCA Azul.jpg

Plugging problem: damaged cased-well 
 

A provisionally closed well, with the casing highly damaged, with no access to the bottom.

Reservoir with total fluid loss.

Tubing end was close to the bottom of the well.

4_edited.png

An interception well was planned and drilled to allow access to the bottom of the original well and allow for definitive plugging and abandonment.

The remaining column in the original well below the window was hydroblasted. 

The working column descended through the interception well and entered the original well through the window.

A CST with a lower cement plug was made and the top checked.

Then, a “U” shaped intermediate cement plug was carried out in both wells, followed by a surface cement plug.

bottom of page